« Second Manufacturing 2 | Main | First Manufacturing 3 »
GCC : Second Manufacturing 1

We quicly outgrew the first manufacturing space (and besides, we needed that area for sales and marketing staff). So, the second location of manufacturing was a narrow space on the 2nd floor front of the building.
Posted by Steven at May 24, 2005 08:46 PM